Our team is available now for consultations
TendersTechnical ProposalsPricingPlanningCorporate IdentityISOFeasibilityERPOperations
Pillar One

Government Tender Intelligence

Full lifecycle management โ€” from spotting the opportunity on Etimad through contract signature.

1.1

Daily Etimad Monitoring

Daily alerts on relevant opportunities, classified by category, value, and sector โ€” with competitive analysis of recurring contractors and win-probability scoring before you commit.

1.2

End-to-End Bid Submission

Complete handling of submission procedures: documentation prep, Etimad portal upload, query management, and attendance at clarification meetings on your behalf.

1.3

Competitive Intelligence

Forensic reading of competitor behavior in past tenders: targets they prefer, price ranges, technical weaknesses โ€” and positioning recommendations for you.

Pillar Two

Technical Proposal Engineering

A technical proposal that does more than answer the RFP โ€” it convinces the evaluation panel you are the technically superior choice.

2.1

Proposal Writing

A 12-section structure tested across 200+ winning bids.

2.2

Execution Methodology

Workflow maps, sequenced phases, and inspection checkpoints.

2.3

Time Schedules

Primavera P6 / MS Project at consultant-grade quality.

2.4

Quality Control Plan

ITP/QCP aligned with each owner's requirements.

Pillar Three

Strategic Pricing & BOQ Engineering

Price is 40% of the win equation โ€” but reaching it is not arithmetic. It is a complex engineering problem balancing the win and the margin.

3.1

BOQ Engineering

Forensic line-item analysis, quantity verification, identification of items likely to become future variation orders, and precision pricing per item.

3.2

Full Cost Modeling

A pricing model that separates direct from indirect, ground and labor costs, overheads, taxes, and financing โ€” with full traceability.

3.3

Competitive Margin Strategy

The margin that wins the tender without consuming the cost โ€” calibrated against analysis of winning prices in comparable bids.

3.4

Sensitivity & Scenarios

Stress-test the financial offer against three scenarios: inflation, execution delays, and variation orders โ€” to defend the margin.

3.5

Price Positioning

When does the lowest bid hurt you? When is the median price most persuasive? The science of positioning a number inside an evaluation committee's logic.

3.6

Pricing Risk Analysis

A full map of the risks that can turn a winning bid into a losing contract โ€” and the contractual safeguards we embed to prevent it.

Pillar Four

Planning, Scheduling & Control

From the bid-stage time program through daily field progress reports โ€” an integrated planning system.

4.1

Primavera P6

Setup and operation of professional schedules accepted by the most demanding owners.

4.2

MS Project

Precision scheduling for mid-size projects with calculated resource leveling.

4.3

Cost Control

An EVM system tying financial performance to field execution.

4.4

Risk Management

Live risk registers, probability/impact scoring, and ready-to-deploy response plans.

Pillar Five

Corporate Identity & Digital Presence

Before you compete for a tender, you must look like a firm that deserves it.

5.1

Company Profile Engineering

A profile at the level of top-tier consulting houses โ€” turning your experience into a visually persuasive narrative.

5.2

Website Development

A professional website with custom identity, optimized for speed and SEO, presenting your firm at a level matching your tender ambitions.

5.3

Project Portfolio Restructuring

Re-presenting past projects to highlight challenge, solution, and outcome โ€” not a list of names.

5.4

Corporate Email

Domain-based email infrastructure (Google Workspace or Microsoft 365) with unified professional signatures.

5.5

Social Verification

Verified status on LinkedIn and Twitter to elevate institutional credibility before government entities.

5.6

Google Maps Optimization

Setup and optimization of Google Business Profile, review management, and local visibility for projects.

Pillar Six

ISO Certification & Accreditation

Internationally recognized certificates issued in 3 working days โ€” without hidden fees or convoluted requirements.

ISO 9001 โ€” Quality

The standard quality management system required in every government tender. Fast issuance with a ready-to-implement quality manual.

ISO 14001 โ€” Environment

An environmental management system meeting Ministry of Environment and owner requirements on environmentally sensitive projects.

ISO 45001 โ€” H&S

Occupational health and safety management โ€” mandatory for most government construction tenders.

ISO 27001 โ€” Infosec

The information security system required for IT, telecom, and sensitive infrastructure tenders.

ISO 39001 โ€” Road Safety

For roads, transport, and maintenance tenders on highway networks.

Contractor Classification

Support for raising classification with the National Contractors Authority โ€” class transitions and accreditation renewal.

Pillar Seven

Feasibility Studies & Investment Advisory

Investment-grade studies that attract financing, partners, and shareholders โ€” not routine paperwork.

7.1

Investment Feasibility

Market analysis, multi-scenario financial modeling, IRR and NPV calculations โ€” output ready to present to financiers.

7.2

Financial & Operational Plans

5โ€“10 year financial plans, revenue projections, cost structure, and break-even analysis for clear investment decisions.

7.3

Market & Competition Studies

Deep analysis of the contracting sector in a defined geography: market shares, gaps, and qualitative opportunities.

Pillar Eight

ERP Systems & Operational Governance

Digital transformation is not a luxury โ€” it is the difference between a firm that absorbs one contract and a firm that runs ten in parallel, profitably.

8.1

ERP Selection & Implementation

Needs assessment, selection of the right solution (Odoo, SAP B1, Oracle NetSuite, Dynamics), and end-to-end implementation.

8.2

Project Management Systems

Implementation of project platforms (Procore, Primavera Cloud, Asana) tailored to the Saudi contracting sector.

8.3

Financial Systems Integration

ERP connection to the e-invoicing platform (Fatoora), ZATCA, and bank systems for full automation.

Pillar Nine

Operational Excellence & Governance

From contract management to procurement to risk โ€” governance systems that turn chaotic firms into disciplined machines.

9.1

Cost Control Frameworks

A disciplined cost control system: cost centers, real-time tracking, variance alerts, and executive monthly reports.

9.2

Risk Management Systems

Live risk registers, response plans, contingency reserves, and quarterly executive reporting.

9.3

Procurement Strategy

Approved supplier lists, price negotiations, framework contracts, and supply chain optimization for 8โ€“15% cost reduction.

9.4

Optimized HR

Organizational structures, role definitions, performance evaluation systems, and incentives tied to measurable KPIs.

9.5

SEO & Media Relations

SEO strategy putting your firm in local search results, plus PR placements with recognized media platforms.

9.6

Training & Development

Programs training your teams in tender management, pricing, and proposal writing โ€” until capability becomes internal and sustainable.

Engagement Models

Three models to match your stage, precisely

From a single service to a full advisory partnership โ€” choose what fits your firm's maturity and ambition.

Essentials Package

From SAR 12,000
per service
  • One advisory service
  • ISO certification issuance
  • Professional company profile
  • 30 days of support
Book a Consultation

Full Partnership

Scope-based
base fee + contract %
  • Comprehensive institutional transformation
  • ERP system implementation
  • Dedicated advisory team
  • Performance agreement (KPIs)
  • Genuine results sharing
Discuss with Us

Ready to re-engineer your position in Saudi contracting?

Start with a free 45-minute diagnostic. We'll pinpoint exactly where opportunities are leaking and how to stop the bleed.